Showing posts with label House repairs. Show all posts
Showing posts with label House repairs. Show all posts

Saturday, June 25, 2016

The slowest build...

I would like to say that things are progressing on the boring till, and there are...but at a glacial pace...


I started on it in earnest on May 21st, getting down my requirements then figured out my dimensions. After a few last minutes changes, I ''finalized'' my design on the 24 of May, then two days later, I cut and machined my frame pieces.

If you look closely, you can see the knot at the end on the top piece

It was not until the 19 of June that I finally cut the pieces to final length. I previously cut them slightly longer in order to have some fudge factor for the final in situ size.

That was the maximum size I will entertain with this space.
I decided to cut it back a bit. I look a bit too large

 Once I was satisfied that my new till would fit its intend location, I could then cut the dovetail pins on the long side pieces (2), then on the 22nd I cleaned the joint half, ready to transfer my pins on the side pieces.

Me getting away using the dining room table...

I was going to finished them on the 23rd, but by then I realized I somehow missed a big knot smack on the end of one of my side board, not good...

How the heck did I miss that earlier??
Where it land would give me lots o trouble it has to go!

So yesterday, Friday,  cut off that knot, which means my final dimension would be a tad smaller than anticipated, but still close enough to my experiments sizes that I'm not worry about making it hold the tools I have in mind (always subject to last minutes changes of mind anyway :-)

It is not because I'm slacking off, I just had a myriads of things vying for my attention... besides Rudy!

Rudy helping me with my house inspection

First there was my annual walk around inspection of the house, looking at how the paint and caulking survived the winter and etc.
There always seems to be small spots here and there, and this year was no exceptions, the front get the worse of sun and wind, there are always some spots that have the beginning of paint peeling. These I scrapped then prime and paint.
 
These spots were a lot smaller before I scrapped them

We are going thru a heat wave right now, so that limit my opportunity window for painting. You should not paint when it is too cold, nor too hot.
Followed the weather forecast for a while and managed to squeeze it in, all my spots are done. And then there are the multiples flower beds that need cleaning and new plants etc, etc...

Done for another year...


Did more executor stuff, pretty well all done, the only remaining items are shopping for house and car insurance (in progress) and select a suitable headstone... After I pay for the funeral, ouch!
And I finally got my car fixed, ($521 later, I hate rodents!)
My paperwork for my veteran plate came back, got my vet plate on the car.
Some of my civilian friends asked me if I was worry about advertising my military background in the wake of all these terrorists attack.
Oct 2014, a lone gunman shot dead one of our sentry at our national war memorial in Ottawa then storm the parliament building, he was shot dead by the Sgt at arms for parliament. And shortly before that another member in uniform was run down in a parking lot in St Jean Qc.

This editorial cartoon in the Halifax Chronicle from Bruce McKinnon resonated around the country. The signed original has been given to the family of Cpl Nathan Cirillo 

Hell NO, I may be retired but I'm still dangerous.. Don't let the gray hair fools you :-)
Ever see the movie R.E.D.  with Bruce Willis ?
Thread lightly on vets :-)

This Sunday, Rudy and I are attending one of the three celebrations of life for Heather.
The first one being in Halifax, organized by the members of her African Violets society in the city.

The next one would be held right here in my house on Canada day ( Jul 1st), then the last one, still in planing stages, would be in Ottawa. So all that to say, that I am not expecting to finish this boring till this month.... Unless there are 90 plus days in June... (Inside joke about the build a chair in the month off Jun..ish)
Which reminds me, I better get off my butt and decided what I'm gonna build for that event...
I thought I had a suitable piece of pine for the seat blank, but it is not thick enough, may have to laminate some stock. So will I be able to finish that chair project this month? Well has long as this June is as long as the last one, then yes!
Right Brian? :-)

Bob, hoping to get some clearing done in the garage...

Tuesday, April 19, 2016

Yard works

You probably noticed that there isn't much woodworking related posts lately...

I am a full time nurse these days.

Still, with friends help I am able to take care of small stuff around the home.
With the sun getting stronger every day, she has expressed an interest in going out on the back porch to take it in.
That means time to get into the backyard shed....

But before I go in, I need to take care of a broken tree in front of it.
And thankfully Rudy recently graduated from twigs to small branches, so he is rearing to help :-)

Earlier in the year we had freezing ice/snow and high winds damages.
That white birch tree by the porch has recovered... some 

The cherry tree by the backyard shed has lost two trunks.
It need to go before I can get in the shed 


So, Rudy and I went out to cut down the two trunks hanging down in front of the shed.

Notice the accumulation of dirt inside the trunk, 
there was not much solid wood holding these two trunks

You can see where I cut, there was not much wood left holding it.

The two removed trunks.

With these out of the way, I was able to retrieved the deck furniture.

I think this tree will have to come down, I'm not sure
 it would survive much longer with that big scar.

Whenever I cut it down, I will try to salvage some wood to make something out of it. I'm certainly not expecting much board foot out of it, but should be able to get some piece to turn or carve.

When I went in, I noticed that the roof on the right hand side part as sprung a leak. About three years ago I looked into putting on a new roof and siding, but after pricing the work required, decided against it and just fixed it and repainted it, intending to built a new one down the road.  That point is coming soon...

We did not had a bad winter this year, as opposed to the never ending one last year. But the freezing rain and high gusts of wind took their toll on both the shed and deck.  Similarly, 4 years ago, I decided to just fixed the deck instead of replacing it for now.  It too would have to be replaced in the near future...

At the time we bought the house in 2011, we knew from the inspection that the deck needed some attention. The ledger board was rotting and attached to the house by rusting away spikes. We simply temporarily support it in order to detach it and replaced the ledger board  .

This is how we pulled the deck away from the house, 
while being supported in order to replaced the ledger board.

New pressure treated ledger board installed in two sections, 
lag bolted to the house and flashed

Once that was done, some of the worst damaged or 
rotten deck boards were replaced. 
Additional support added to the understructure.

And a bunch of new parts were made to solidify the railings

The final look in 2013. Safe and sturdy for a few more years
 before being replaced.


That was to buy us a few more years before being replaced, its time is coming soon, it too suffered damages this winter. Not sure yet what I will replaced it with, but the back yard is in need of landscaping, so I will tackle it at the same time. Something bigger for sure and probably multi levels (?)

This morning we had a short visit from her cousin Cathy in New Brunswick, they arrived yesterday. Cathy and her husband Maurice came with their little dog, Mike. As always, it is comforting to have loved ones visiting but the goodbyes take on a different meaning...

Time is marching on inexorably... :-(

Bob, with a lump in his throat

Sunday, April 17, 2016

Small improvement to the Ensuite bathroom

A few years ago when we remodeled the main bathroom we tried one of those new Comfort height also called Right height toilet.
What is the difference? Our standard toilets have the rim of the bowl at a height of 14-1/2 in, the comfort ones stand at 16-1/2 inches height.
By the time you add the toilet seat, you are now seating at a comfortable chair's height.

That 2 inches makes a big difference in ease of seating and getting up after.
Once you get used to it, it feel like the regular ones are much lower...

With Heather mobility getting restricted more and more, it was time to put one in the Ensuite bathroom to help her out.

So guess what I did this Week-End?....

The original toilet.

Out with the old...

In with the new...

From start to finish it only took me half an hour. And that included chasing Rudy to get some parts back. He was banned from the room after :-)
I was pleasantly surprised by the completeness and quality of the components includes in this "All in one" toilet kit from American Standard, nothing else to buy. The instructions even says no tools required... Yes, that is true because they furnish a special plastic nut driver for the tank to bowl connections and also the toilet seat bolts, clever. Everything else is easy to grip for a snug finger tight connections. No leaks on first try, bonus :-)

This is what the Ensuite looked like at purchase time...

As bought. Behind the curtain is a space for the plumbing and storage 
since the shower enclosure is pushed far to the left.

The place was totally gutted to the studs, removed traces of mildew and made the room water and mildew proof by using cement boards for the walls.

The floor redone

The window replaced

New sink and mirror, light fixture

New shower enclosure and relocated to the right


The only thing I was worried when I remodeled this space was the space between the shower enclosure and the toilet. This is a rather small space and it had to fit. I went with a neo shaped enclosure and the door open to the left, and I re-used the original toilet which had a round bowl. I prefer elongated bowl (like in the main bathroom) but was worried about space.

Found a round bowl comfort height toilet so that is what I put in, good thing I did not used an elongated one because I still managed to loose about 1-1/2 in of space, would have been a few more inches if elongated.

The plan at the time was to remodeled this Ensuite bathroom before tackling the main bathroom. 

Original main bathroom

Entry door was relocated to the left. I would have never been able to 
contortioned the big soaker bath into this space if I did not do that first. 
And now it is a lot easier to wheel her in and out of the bathroom also. 

The new one. 61 in walnut vanity, granite counter top with two under mount sinks. New soaker tub, shower fixtures etc. in a tiled enclosure.

New hi efficiency comfort height toilet with electronic bidet, 
its remote is on the countertop.

The floor has a Ditra membrane  and Kerdi membrane on the tiled walls. Everything is sealed and waterproofed, meaning I don't ever expect mold down the road...
Once both were done, I then remodeled the one downstairs in my man cave.

Original man cave bathroom

Remodeled man cave bathroom.
The oval medicine cabinet/mirror in the wall was recycled 
from the Ensuite bathroom


All three bathrooms in the house have been brought into the 21st century, one at a time. Similarly the kitchen was also remodeled extensively. We are pretty well done with all the renovations we had planned into this house. We had contemplated moving one more time, but it is obviously not going to happened anytime soon. And I don't foresee moving after she is gone :-(

Bob, trying to make it easier for Heather.

Thursday, November 12, 2015

Small distraction ...

Lately, I'm overdue to even go close to the shop, but somehow, I just can't do it...

So the other day, when a friend ask me for some help replacing his water heater, I said, sure... (could uses the distractions) :-)

The older one, removed. 
There was a mess of elbows on it to connect to the water lines!


Redid the hot water line from the T, added a valve and a 45 degrees elbow 
to match the other side. Only had to add a thread adapter on the cold side.
Flex lines, stainless braided, will not burst, connect the water tank to the house plumbing. Next swap would be a breeze. (Within 10 years) 

Did not trusted the wiring in place, the line (14/3) was coming from a light fixture ceiling box...???

Are you kidding me??
Green wire coming out on top is the 220V line to the water heater.

What we have is the switched 120V power from the light switch to the bulb and a dedicated (?) 240V line spliced inside same light junction box. 
That is a big No-No. They even tied the red to ground??

When we pulled the fuse block (service entrance is the older fuse panel) for the water heater, there was some serious overheating damages to it and on one of the fuse itself (Discolored metal, Bakelite crumbling).
Something went very wrong and was probably over fused... Cannot read the fuse rating on the discolored ones.

Ran a new dedicated line, 12 Gauge to water heater straight from service entrance to water heater. Used a different unused slot in service entrance and a new fuse block, fused correctly. Removed old 240 V line from ceiling box.
Everything is back working...safely.

Had a look at where the old water heater leaked.  Normally they always go on the bottom, caused by rust.  Not that one!!

It bursted at the seam...
In theory, the safety valve is supposed to avoid pressure build up inside.
Somehow, that one bursted... Could had been much worse...

They were lucky, it could have caused a catastrophic water failure and it very well could had caused a electrical fire.

In theory, we are supposed to once a year, flush the sediment from the bottom of the tank, to avoid early rust failures. And test the safety valve to ensure it is not stuck closed. But honestly, who of us do that every year....
At best I do mine once in a while, but at  least, it does get flushed and the valve exercised... once in a while.

Service life of these electric water heater is usually less than 10 years, hence why when you buy a house in Canada, if the water heater tank or the oil tank, if present... They must be less than 10 years old in order for your insurer to insured your house.  Of course if you never sell your house, you may very well end up with the actual one until failure, whenever that is...

House maintenance, it never ends...

Bob, the age old maintainer, whose water heater is coming to the end of his service life...sigh!

Thursday, September 3, 2015

Almost done

This morning I installed my flashing on my corner eave.


Once all the roofing cement, caulk etc is dry, I will prime and paint my new piece of wood. As it is pressure treated and I coated it liberally with paintable end cut preservative, it is now weather proof, even before I paint it.
That corner is now also bird proof and I expect no more leaks from that spot.

Then I had to cut back the vegetation on the side of the house to move my ladder in order to attack the power mast problems.

The morning sun to the right is washing out the pics

That would do.

Looking a that picture I think the problem was that they did not oriented the slope top part correctly and the rubber boot shrunk up a bit, leaving a gaping hole.

 That picture also appear to show one nail on top of the flange buried under the shingles. So I thought I could get lucky take out that nail, and turn that flashing flange around.
Turned out, there are no nail showing and the thing is solidly attached to the roof...

Plan B. See if I can slip down the rubber gasket.
Yes I can, pheww...

So I put some of my roofing caulk all around under the seam then put two nails to secured it down. I then smooth out the oozing caulk all around making sure I have a good coverage. Both on the roof flange and on my fingers (I run out of rubber gloves :-)


Not sure I want to trust that the rubber gasket will stay put, so I also ran a bead of roofing caulk on top of it in an effort to seal it down. Will keep an eye on it to make sure it doesn't uncover a big opening again (see first pic of flange).
If it move again, I'll wrap it with some sort of rubber membrane.

Meanwhile, back on the garage window, I put on a coat of epoxy on the now solidified (was crumbling) wall fiber board corner. That should prevent further deterioration.

I put in a wax paper separator between the wall and the window frame.
I don't want to glue the frame to the wall. That window will be replaced later.


I am now out of epoxy glue, will need some more for the last piece of wood on my window frame trim (the brick mold). I'm also thinking of making a better fitting piece, it is after all the show piece :-)

Managed to get all clean up without making too much of a mess in the bathroom downstairs :-) That gritty orange soap stuff is great to tackle oily tar etc, hopefully by the time she gets up, all trace of my mess would be erased...

Bob, on a quiet cleaning spree.
What was that Honey? No, I did not make any mess :-)